Properly designed slope protection and stabilization has to include two components: a vegetational-biological and a mechanical-structural component. The State of Maryland pledges to provide constituents, businesses, customers, and stakeholders with friendly and courteous, timely and responsive, accurate and consistent, accessible and convenient, and truthful and transparent services. 2 0 obj The contract plans will designate the required rock layer thickness for each location. Project Details For EA 04-0A0204 - California There are three material gradation requirements based on required rock layer thicknesses. with a minimum of 50% of the stones . (b) Paving fabric specification requires a minimum mass of 4.1 sy/oz. CHAPTER 5 SURFACE AND SLOPE PROTECTIVE MEASURES - Food and Agriculture Slope paving is a broader term that covers a variety of methods for paving slopes, including colored slope paving, exposed aggregate slope paving, and slope paving with concrete pavers. Place a layer (six inch minimum) of Consult engineer to ensure applicable design requirements are met. Click it again to reverse the order. Also, ensure the contractor does not drop rock into place; otherwise, cracking or breaking may occur. endobj mum slope of two feet of horizontal distance for one foot of vertical rise. Review contractors verification of unit weight of rock-filled gabions. Note any changes that may have occurred between the preliminary design studies and the start of construction. Technical Support available for assistance. Rock Slope Protection / Rip Rap - Graniterock 6'' min. > Nominal RSP class by median particle diameterb Nominal median Geotextiles - Feature Comparison - Hanes Geo - Leggett & Platt Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) Shop Lowe's for solutions to control erosion on slopes, as well. Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. Erosion Control at Lowes.com Chapter 4: Construction Details, Section 72: Slope Protection If the slope is steeper than 2:1, do not use rounded boulders and cobbles. Refer to Section 6-202, Responsibilities for Acceptance of Manufactured or Fabricated Materials and Products, of this manual for additional information. Concrete canvas (CC) has the potential to become a widely used slope protection material owing to advantages such as flexibility, fast construction with low labor costs, and quick strength development. Soil Stabilization Matting - Slope Application, Clear Water Pipe Through Silt Fence/Super Silt Fence, Temporary Stone Outlet Structure (1 of 2, PDF only), Temporary Stone Outlet Structure (2 of 2, PDF only), Temporary Gabion Outlet Structure (1 of 2, PDF only), Temporary Gabion Outlet Structure (2 of 2, PDF only), Standard Inlet Protection (1 of 2, PDF only), Standard Inlet Protection (2 of 2, PDF only), Combination Inlet Protection (1 of 2, PDF only), Combination Inlet Protection (2 of 2, PDF only), Pipe Outlet Sediment Trap ST-I (1 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (2 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (3 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (1 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (2 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (3 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (1 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (2 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (3 of 3, PDF only), Concentric Trash Rack and Anti-Vortex Device (1 of 2, PDF only), Concentric Trash Rack and Anti-Vortex Device (2 of 2, PDF only), Types of Couplers for Corrugated Steel Pipe, Sediment Basin Schematic - Horiz. TAR_%R5Wa%*x4ux-x5d1c iU:v9b!KXGcFK 1fN2 t K! (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. =w (j($M/!bMbo,iDjQL1{L! %PDF-1.4 % Ensure the equipment used during spreading does not crack the rock. <> Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. 8 0 obj Details from the 2011 Maryland Standards and Specifications You may check the size of rock by roughly measuring the size and converting the volume to mass. The samples will be crushed in the laboratory to sizes needed to perform tests. This translates to a 0.75H: 1V incline and is shown below. 2019-07-30T13:47:33-04:00 Civil engineers and landscape architects need proven solutions to control soil erosion, stabilize slopes, enable drainage and create a visually pleasing landscape. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Angular shaped rock may be used on any planned slope. Class 2 is the default Class for M288 applications. When slope paving with concrete pavers is specified, ensure the special provision requirements are met. Mirafi N-Series nonwovens combine high water flow rates, high soil interaction and durability while providing excellent soil particle retention. Caltrans Riprap Sizes - Plainwater Benchmark inspection of sampling and testing of rocks. Test panels may be specified in the special provisions. 0000011079 00000 n Start by choosing whether your patio is a **single rectangle** or if it has a different shape, in which case you. (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. The gabions are placed on filter fabric as detailed in the plans and specifications. YOU MUST NOTIFY US FABRICS BEFORE RECEIVING PRICING. Fabric must be RSP fabric that complies with the class shown in the following table: Rock must be cobble, gravel, crushed gravel, crushed rock, or any combination of these. Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. We're available on the following channels. California Department Of Transportation: Item Code Search endobj Resident engineers should be familiar with the material contained in Chapters 870, Bank ProtectionErosion Control, and 880, "Shore Protection," of the Highway Design Manual. endobj IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN Caltrans New Riprap Classes - Plainwater 0000013346 00000 n Rock riprap consists of loose rock that is dumped on the slope and distributed. 0000002044 00000 n 1 (You may enter part of the word or the whole phrase). endobj When evidence exists that the foundation depth is inadequate, obtain both the design and hydraulics engineers concurrence with a change order to deepen the foundation. Ensure that rocks of the specified sizes and shapes are being used. 2019-07-30T13:44:04-04:00 BMP040 "rock slope protection (no fabric)" as applicable. Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. Retaining Walls & Slope Stability Observe construction to ensure the contractor does the placing, finishing, and curing as specified. 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). Be sure to consult your local project engineer or construction professional about the rock sizing and particular . The devices include ground covers and channel liners such as: 1. For maximum effect, both components must be integrally planned prior to road construction. Mirafi 135N, 140NL and 140NC are lighter weight versions of Mirafi 140N . in a MS Word document format from the DM[2TI=lGQx7 UoFK1: V;39LFOr7LxPF{BL3he6X^@v[QhWiF!l3F) RTIBfx0.T F%n3h80Q,`[2xa%VLP /WD@j rK .9{N[#o/Fad#OK6YeqsyHl2M)V]/Nf(V?!1Oaw)fM 8JG)31m. 0000005658 00000 n Draw Down Device, Temporary Access Bridge (1 of 2, PDF only), Temporary Access Bridge(2 of 2, PDF only), Temporary Access Culvert (1 of 2, PDF only), Temporary Access Culvert (2 of 2, PDF only), Onsite Concrete Washout Structure (1 of 2, PDF only), Onsite Concrete Washout Structure (2 of 2, PDF only), If you are experiencing difficulty accessing these details or if there are anyquestions, please contact the Sediment, Stormwater & Dam Safety Program at (410) 537-3543 or by email (Amanda.Malcolm@maryland.gov, National Human Trafficking Hotline - 24/7 Confidential. Upstream Slope Protection | Association of State Dam Safety Geotextiles - Products - US Fabrics >> % When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. These products were developed to meet specific agency (DOTs, MTOs, etc.) 0000000928 00000 n Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. Paver Border InstallationPavers are "wet set" into concrete to create a engineering fabric pinned to the slope, or both a . To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. Before placement of the broken concrete, inspect the material and be sure the reinforcement has been removed flush to the surface of concrete. The Standard Specifications provide two methods of placement for this type of protection: Method A and Method B. California Department Of Transportation: Item Code Search ITEM 601 SLOPE AND CHANNEL PROTECTION - Pages :t4NV]j{/mtqF*sx[%M 5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek B. Cables. <>stream Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Mirafi 140N is a lightweight non woven geotextile that meets AASHTO M288 Class 3 geotextiles for separation and subsurface drainage. Design and construction application of concrete canvas for slope protection The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. 0000009704 00000 n Woven Stabilization and Separation Geotextiles, - Dimensions & Weights for EcoTubes Geotextile Dewatering Tubes, - Dimensions & Weights for EnviroGrid Cellular Confinement, - Material Safety Data Sheet (MSDS) - Drainboard, - Material Safety Data Sheet (MSDS) - Stratagrid, - Material Safety Data Sheet (MSDS) - Envirogrid, - Product Advantages of EcoTubes Geotextile Dewatering Tube, - Product Benefits of EcoTubes Sludge Dewatering Tubes, - Product Benefits of US Fabrics' Foundation Drains, - Product Benefits of US Fabrics' Sheet Drains, Design/Installation Guidelines; Applications, - Comparing Old Style & New Style - Strata Geogrid, - French Drain Exterior Foundation Install, - Geogrid & Welded Wire Form Inside Corner Placement, - Installation Guideline for Separation Heavy Geotextile, - Installation Guideline for Separation Medium Geotextile, - Sheet Drain Exterior Foundation Install, - Theoretical Tube Volumes & Dewatering Capabilities, - Typical Cross Section - Vegetated Reinforced Soil Slope, - Equivalent Products for Composite Drains, - Volumes & Dewatering Capabilities for EcoTubes Geotextile Dewatering Tubes, - Geogrid Quality for Finished Product and Raw Materials, - Use Woven Geotextiles Instead of Geogrids, - Municipal Waste Water & Water Treatment w/ EcoTubes, - SRW (Segmental Retaining Wall) Drainage. Barrier Landscape Edging & Paver Edging 6'/8. Use all suitable material in the work. Enter the item description of the code you wish to search for: EZw5'dr=`j+2\8:U.|V,%)~h/X8ps << { , IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN. The contractor must also ensure the construction of adequate returns and keys at the ends. Close observation is required during rock placement to detect any damage to the fabric. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. 0000012468 00000 n 3 0 obj Running Mask Near MeSocial distancing standards are . Or fastest California Department of Transportation 5 0 obj Lap 6'' min. 1, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. This has been superseded by Caltrans New Riprap Classes. trailer << /Size 489 /Info 438 0 R /Root 464 0 R /Prev 989742 /ID[<23d8c9b814a334ef8bf252da6b923edc><23d8c9b814a334ef8bf252da6b923edc>] >> startxref 0 %%EOF 464 0 obj << /Pages 445 0 R /Type /Catalog >> endobj 487 0 obj << /S 1440 /Filter /FlateDecode /Length 488 0 R >> stream Temp. Protection involves constructing a heavy mass of smaller rocks bound together by concrete. Slopes & Walls | Geofabrics endobj The gabion method consists of placing wire mesh box-shaped baskets filled onsite with hard, durable rocks. - Shoreline Protection with EcoTubes&trade; CALTRANS does not have an APL/QPL for fabrics. If the fabric is joined by stitched seams, stitch with contrasting colored yarn. Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. Source: Caltran Highway Design Manual, Chapter 870 If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed in Section 4-7203A, Rock Slope Protection, of this manual. <> Chapter 4: Construction Details, Section 72: Slope Protection, Direction of flow and angle of impingement at various water stages, Capability of adjacent soil types to resist erosion from wash and eddy currents. Rock Slope Protection Fabric, used in slope stabilization projects (see Technical Note on Rock Slope Protection / Rip Rap) When required by the Project Engineer, a Certificate of Compliance for each type of fabric being used should be issued by the supplier and furnished to the Engineer. 72-2.02B Fabric Fabric must be RSP fabric that complies with the class shown in the following table: 72-4 SMALL-ROCK SLOPE PROTECTION 72-4.02 MATERIALS Soil Stabilization Matting - Channel Application, Temp. /Type/ExtGState The latest list of Item Codes is available from HQ To provide the desired cleanliness, the contractor may need to sluice the rock or facing. 0000002021 00000 n Products with a are available to meet BABA (Build America, Buy America) requirements. Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. If the rock contains an excess of fines or inadequate voids, the desired results may be impossible to obtain. 0000014254 00000 n <>stream The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. | Conditions of Use | Privacy Policy Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. endobj Mirafi 180N is a moderate weight nonwoven geotextile that meets AASHTO M288 Class 1 geotextiles for separation and subsurface drainage. 0000015681 00000 n The chart below lists US Fabrics' geosynthetics meeting CALTRANS specifications. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. . PDF Riprap Slope Protection Keep records up to date. PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0 0=F5VvL(^f Verify the types of measurements and records necessary to support payment for the work. Click on the product name for a data sheet. The plans indicate the minimum depths of foundations. If the rock layer is shown as 7 inches thick, comply with grading shown in the following table: If the rock layer is shown as 5 inches thick, comply with the grading shown in the following table: If the rock layer is shown as 4-inches thick, comply with grading shown in the following table: Granular material must contain at least 90 percent crushed particles when tested under California Test 205. Your search for great running gear starts and ends with us. Other Names Rock Slope Protection. In 2007, the FAA approved construction of a new center field taxiway (Taxiway Mike) to alleviate airfield congestion. {.sAewh[w#Iv#W6f" $JOPf/W%%XKK&A~b ?nfY_iu"m]HDwP) Rp 0000005681 00000 n Maximum slope 1.5:1 horiz:vert, (67% or 34) or flatter, and is limited to slopes < 30' of uninterrupted length. In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. Weight will vary based on density of rock available for the project. Need quick pricing on Erosion Control Fabric? The concrete slope protection method consists of paving the embankment with portland cement concrete. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. endobj PDF RIPRAP - Texas Department of Transportation Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 Any springs or water courses that might affect the stability of the design. Slope protection is usually needed to protect the upstream slope against erosion due to wave action. Type R. Use stones between 50 and 250 lb. ), Geocomposite Wall Drain (w/ 6oz on 1 or 2 sides - Please specify.). rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . <> com routes make excellent running trails for serious runners and casual joggers, alike. XYo[unHCih,(~ t@K{ y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H /$Q-Aav. 0000008331 00000 n For RSP Classes IX thru XI, use Class 10 RSP-fabric. PDF California Bank and Shore Rock Slope Protection Design
Rugby Grace Before Meals, Coordinating Client Care: Addressing Priority Issues During Case Management, Articles R